Recessed / Grates

Recessed entrance mats and grates sit inside a prepared floor recess to create a clean, nearly flush transition at commercial doorways. These systems provide a durable walk-off surface while collecting tracked-in dirt and moisture below or within the assembly. They are used in offices, hotels, schools, hospitals, stores, civic buildings and other high-traffic entrances.

Our selection includes aluminum entrance mats, roll-up grilles, rigid grates, rubber-hinged and aluminum-hinged systems, recessed cocoa matting and heavy-traffic architectural options. Many systems can be made to project dimensions with a choice of tread inserts, colors and frame components.

Showing 1 to 16 of 16 (1 Pages)

RG-250 Grate

RG-250 Grate

Material: Aluminum
Max. Load: 1000 lb./Wheel
Thickness: 3/4"
Mounting: Recessed
View Options
EM-650 Grate

EM-650 Grate

Material: Vinyl/Aluminum
Max. Load: 350 lb./Wheel
Thickness: 7/16"
Weight: 2.3 lb./sq. ft.
Mounting: Recessed / Surface
View Options
RG-700 Grate

RG-700 Grate

Material: Stainles Steel
Max. Load: 500 lb./Wheel
Thickness: Multiple
Mounting: Recessed
View Options
RGB-200 Grate

RGB-200 Grate

Material: Bronze Alloy
Max. Load: 350 lb./Wheel
Thickness: 13/16"
Mounting: Recessed
View Options
RGA-200 Grate

RGA-200 Grate

Material: Aluminum
Max. Load: 350 lb./Wheel
Thickness: 13/16"
Mounting: Recessed
View Options

How to specify a recessed entrance system

  • Verify the recess: measure length, width and depth at multiple points. Recesses are not always perfectly square, and the finished system must allow appropriate clearance.
  • Match traffic: consider pedestrian volume, rolling loads, entrance width and cleaning access. Product data identifies construction and intended duty.
  • Select the surface: carpet inserts wipe and absorb, abrasive inserts add scraping action, and open grilles provide space for debris to fall below the walking surface.
  • Plan the frame: new construction may include a matching frame and leveling bed. Existing recesses require careful confirmation of depth and edge conditions.
  • Consider maintenance: roll-up or removable sections simplify access to the recess for regular vacuuming and debris removal.

New construction and replacement projects

For a new entrance, coordinate the grate depth, frame and surrounding floor finishes before the recess is poured or finished. For replacements, provide field measurements and information about the existing frame. Large or irregular systems may be divided into manageable sections based on traffic direction and removal needs.

Routine maintenance is essential: vacuum the tread surface, periodically lift or roll back the system, and remove soil from the recess below. Follow the manufacturer’s instructions for inserts, hinges and finish care.

Start with our recessed entrance grate buyer’s guide and recessed mat FAQ. For drawings, unusual shapes or replacement systems, send us your dimensions and project details.

Buyer Guides